1. Title of Project |
Link
Block Building between the Ministries of Health and Finance |
2. Location |
Government
Enclave, |
3. Client |
Government
of the |
4. Value of Project |
P33Million |
5. Start and Completion Dates |
1997
to 1999 |
6. Description of Project (Nature/type, scope
and role performed). This is a 3-Storey Office Block Constructed between
existing Ministries of Health and Finance. It has two levels of parking
(basement and ground floor accommodating 180 cars. It was originally
conceived as the Vice Presidents Office, later changed as Finance Ministers
office accommodation. The Contractor was Murray and Roberts. Role played was
that of Lead Consultant and project architect all 5 SAIA Stages |
1. Title of Project |
Upgrading
of Tutume McConnell Senior Secondary School Phases 1(A &B) and 2 |
2. Location |
|
3. Client |
Government
of the |
4. Value of Project |
Approximately
P50Million |
5. Start and completion dates |
1997
to 2001 |
6. Description of Project (Nature/type, scope
and role performed). Complete overhaul of the Senior secondary School which
saw the construction of 10 Classroom Blocks, Construction 4 Labs and refurbishment
of 6 labs, Multi Purpose Hall, construction of specialised teaching blocks
including the Art, Design and Technology, Home Economics and Agricultural
laboratory blocks, extensive refurbishments and extensions to library, staff
room, kitchen and dining rooms, admin Block and the complete refurbishment of
all existing classroom blocks. The 1st phase was mainly for the
construction of new staff housing and refurbishment of all the existing and
older Houses. External works included the construction of new roads, water
reservoir and upgrading of the sewage pump chamber. The Contractor was
Complant |
1. Title of Project |
Upgrading
of |
2. Location |
|
3. Client |
Government
of the |
4. Value of Project |
Approximately
P41Million |
5. Start and Completion Dates |
1997
to 2002 |
6. Description of Project (Nature/type, scope
and role performed). Complete overhaul of the Senior secondary School which
saw the construction of 14 Classroom Blocks, Construction 2 Labs and
refurbishment of 4labs, construction of specialised teaching blocks including
the Art, Design and Technology, Home Economics and Agricultural laboratory
blocks, Admin Block, new Kitchen and Dining Hall Block, Multi Purpose Hall,
extensive refurbishments and extensions to library, dining rooms, admin and
the complete refurbishment of all existing classroom blocks. The 1st
phase was mainly for the construction of new staff housing and refurbishment
of all the existing and older Houses. External works included the
construction of new roads, water reservoir and upgrading of the sewage pump
chamber. The Contractor was Tlhoraboroko Construction. Role played was that
of Lead Consultant and project architect all 5 SAIA Stages |
1. Title of Project |
Upgrading
of |
2. Location |
|
3. Client |
Government
of the |
4. Value of Project |
P31Million |
5. Start and Completion Dates |
1997
to date (The 2nd Phase of this project was stalled following
contractor’s default which led to the determination of his employment under
the terms of the contract – matter has been referred to Arbitration) |
6. Description of Project (Nature/type, scope
and role performed). Complete overhaul of the Senior secondary School which
will see the construction of 2 Double storey Classroom Blocks, Construction 4
Labs and refurbishment of 6 labs, construction of specialised teaching blocks
including the Art, Design and Technology, Home Economics and Agricultural
laboratory blocks, Admin Block, new Kitchen and Dining Hall Block, Multi
Purpose Hall, extensive refurbishments and extensions to library, and the
complete refurbishment of all existing classroom blocks. The 1st
phase was mainly for the construction of new staff off-campus housing and
refurbishment of all the existing and older Houses. External works included
the construction of new roads, water reservoir etc. We are both the
Architects and Lead Consultants on the project. |
1. Title of Project |
|
2. Location |
Kang
and Molapowabojang |
3. Client |
Government
of the |
4. Value of Project |
P15Million |
5. Start and Completion Dates |
About
to be commissioned |
6. Description of Project (Nature/type, scope
and role performed). This commission is for design of 2No. Core sheds covering
a gross floor area of 1300 square metres per building and is for the storage
of geological samples from all over the country. Construction is anticipated
to commence in September 2002. DLG are lead consultants and have been
commissioned to execute stages SAIA 1 through to five |
1. Title of Project |
Engine
Test Facility and Repair Workshops or BDF Air Arm Wing |
2. Location |
BDF
Air Force Base at Thebephatswa |
3. Client |
Government
of the |
4. Value of Project |
P7.5Million |
5. Start and Completion Dates |
2000
to 2001 |
6. Description of Project (Nature/type, scope
and role performed). This is a highly specialised facility for the testing
and repair of fighter jet engines for the |
1. Title of Project |
|
2. Location |
|
3. Client |
|
4. Value of Project |
Work
in Progress currently valued at P18Million |
5. Start and Completion Dates |
1982
to date |
6. Description of Project (Nature/type, scope
and role performed). Continuous development of Maru A Pula School that has
seen the construction of the Maitisong Cultural Centre, Library, Laboratories,
Classrooms Hostels, Staff Housing and ancillary Facilities. We are both the
Architects and Lead Consultants on the project. |
1. Title of Project |
Regional
Agricultural Offices |
2. Location |
Maun
and Kasane |
3. Client |
Government
of the |
4. Value of Project |
P6Million |
5. Start and Completion Dates |
1998-2000 |
6. Description of Project (Nature/type, scope
and role performed). Design and Supervising Architects of Regional
Agriculture Offices for Ministry of Agriculture |
1. Title of Project |
Church of
Jesus Christ of Latter-Day Saints Chapel and Meeting House |
2. Location |
The
Village, |
3. Client |
The
Church of Jesus Christ of Latter-Day Saints |
4. Value of Project |
P2.9Million |
5. Start and Completion Dates |
2000
to 2001 |
6. Description of Project (Nature/type, scope and
role performed). Meeting House and Chapel for the Church of Jesus Christ of
Latter-Day Saints in the Village. A Single storey building of residential
character constructed in facebricks and concrete roof tiles. We are both the
Architects and Lead Consultants on the project. |
1. Title of Project |
Primary
Schools Primary Schools Facilities Backlog Eradication Programme |
2. Location |
Country
Wide |
3. Client |
Government
of the |
4. Value of Project |
+P1Billion |
5. Start and Completion Dates |
2001 |
6. Description of Project (Nature/type, scope
and role performed). We are part of the Project Implementation team and have been
tasked with the standardisation of all basic building types (Classrooms,
toilet blocks and housing). Other appointed supervising teams will use this
information when tenders are called for the various contracts. We are playing
the role of Architects working under the direction of the project manager
BCHOD |
1. Title of Project |
Upgrading
of |
2. Location |
|
3. Client |
|
4. Value of Project |
Work
in Progress currently valued at P9Million |
5. Start and Completion Dates |
1980
to date |
6. Description of Project (Nature/type, scope
and role performed). Continuous development of Deborah Retief Memorial Hospital
that has seen the construction of an Operating Theatre and X-Ray Wing,
refurbishment of Maternity, surgical, paediatric and general wards and
associated housing. We are both the Architects and Lead Consultants on the
project. |
1. Title of Project |
New
Chancery For the Namibian High Commission |
2. Location |
|
3. Client |
Government
of |
4. Value of Project |
P2.1Million |
5. Start and Completion Dates |
1999-2000 |
6. Description of Project (Nature/type, scope
and role performed). Construction of a new Chancery for the Namibian High
Commissioner to |
1. Title of Project |
|
2. Location |
|
3. Client |
|
4. Value of Project |
P3.4
Million (Estimated) |
5. Start and Completion Dates |
Programmed
to commence April 2003 |
6. Description of Project (Nature/type, scope
and role performed). This is a double storey building covering an area of
approximately 600m˛and is designed in the form 3 interlinked squares in plan
form. We are both the Architects and Lead Consultants on the project. |
1. Title of Project |
8No.
Upper ’D’ Staff Houses for DEBSWANA |
2. Location |
Orapa
Mine, |
3. Client |
DEBSWANA |
4. Value of Project |
P3.2Million
(Estimated) |
5. Start and Completion Dates |
Programmed
to commence May 2003 |
6. Description of Project (Nature/type, scope
and role performed). Design of Upper ‘D’ High Cost Staff Houses each with a
floor area of 240 m˛. Our Commission is as Architects and Lead Consultants to
Stage 4 only. |
1. Title of Project |
|
2. Location |
Molepolole |
3. Client |
Mr.
Gleeson |
4. Value of Project |
P35Million
(Estimated) |
5. Start and Completion Dates |
Phase
1Programmed to commence May 2003 |
6. Description of Project (Nature/type, scope
and role performed). 2 Stream High School in Molepolole comprising 16
Classrooms, 8 Laboratories, school hall, admin block, kitchen and dining hall
and boys and girls hostel blocks complete with all ancillary facilities. We
are both the Architect and Lead Consultant for this contract. |
1. Title of Project |
Shopping
Complex for the Hon. O. Maswabi |
2. Location |
|
3. Client |
The
Hon. O. Maswabi MP |
4. Value of Project |
P1.5Million
(Estimated) |
5. Start and Completion Dates |
April
2002 to March 2003 |
6. Description of Project (Nature/type, scope
and role performed). Single Storey Shopping Complex Consisting 10No.Shopping
Units on a hillside. The works were
originally scheduled for completion in November 2002 but contractor has
defaulted with the consequence that the completion date has been revised to
March 2003. |